HCPLY drills tie holes in formwork plywood to the buyer’s approved pattern and seals exposed bore edges on our construction line before loading. A wrong diameter or misplaced hole can damage film, delay assembly and force a rejected panel batch. The drawing must coordinate ties, cones, framing and fastening zones before production begins.
What diameter should tie holes in formwork plywood be?
The drilled diameter must match the actual tie assembly, including its sleeve or cone where that component passes through the plywood. A rod’s nominal diameter alone cannot define the hole. Specify the required finished bore and permitted clearance on the approved panel drawing, then check a sample against the physical hardware before drilling the production batch.
A snap tie with a small shank, a sleeved through-tie and a cone-bearing system can require different openings. Record the tie supplier’s part reference, the outer diameter at the panel penetration and the orientation of the assembly. The engineer responsible for the formwork checks whether the opening and its position leave adequate panel capacity.
An oversized bore can admit cement paste and leave a visible mark on the concrete. An undersized bore invites field enlargement, which removes the protective seal and delays assembly. For our construction plywood, the construction line follows the approved hole schedule rather than a universal drill diameter.
How should tie holes be sealed for repeated pours?
Seal the complete exposed circumference of every drilled hole, including the inner veneers and any breakout at the exit face. The seal must be compatible with the selected film-faced panel, release agent and site cleaning practice. Keep the opening clear enough for the specified sleeve or tie hardware after the coating has cured.
Our construction line drills the approved pattern and seals the hole edges before loading. A buyer’s inspector can examine both faces, look into the bore for continuous coverage and fit a sample tie assembly. Any site-added or enlarged hole needs the same edge treatment before concrete placement.
With proper handling, a release agent on every pour and sealed edges, including cut edges, melamine-glue film-faced plywood gives about 12–15 pours; phenolic-glue film-faced plywood gives up to about 25 pours. These figures describe complete handling conditions, rather than a separate measured benefit from factory drilling. See film-faced panel care for care across the pour cycle.
What must the factory drilling drawing show?
The drawing should identify every panel, every hole centre and every keep-out zone against a fixed datum. Dimension hole centres from two finished edges, mark the face orientation and distinguish through-holes from blind fixing points. Include a revision identifier so the factory and formwork yard inspect the same geometry.

- Show finished panel length, width, thickness, panel ID and the concrete-contact face.
- Dimension each tie-hole centre in both directions, with diameter, clearance and positional tolerance set by the approved formwork design.
- Identify the tie type, sleeve, cone, washer and bearing hardware; attach their dimensional drawings.
- Mark studs, walers, screw and nail lines, minimum edge clearances, panel joints and openings.
- Mark no-drill areas around reinforcement conflicts, lifting points and other hardware.
- Specify the bore-edge sealing treatment, inspection method, sample approval and drawing revision.
For a plywood concrete snap tie layout, distinguish the breakback feature and cone footprint from the hole through the sheet. A cone can bear against the film surface even when its shank requires a smaller opening. Coordinate the concrete finish and tie-removal details with the formwork designer.
Why factory-seal holes instead of drilling on site?
Factory drilling puts the approved pattern and edge treatment into the panel before the shipment reaches the formwork yard. Repeated setups use one drawing, a controlled drilling sequence and a consistent inspection point. Field drilling can work, but a rushed, unsealed bore exposes veneer edges to wash water and cement slurry.
The difference is a mechanism for preserving the panel face, not a quantified extra-pour claim. Factory sealing protects the fresh cut from its first exposure; site crews still need to recoat damaged edges and any new holes. Inspectors can compare a marked drawing with actual hole centres and check seal continuity under adequate lighting.
Which fastening method fits formwork plywood?
Choose screws for controlled removal and repeated panel use, nails for fast positioning where the engineered assembly permits them, and ties for restraining opposing wall forms. None of these substitutes for the others. Bolts and clamps belong at the specified frame or waler connections, while staples are limited to noncritical temporary work.

| Method | Main job | Panel-face concern | Verdict by use |
|---|---|---|---|
| Screws | Fix sheet to timber or compatible framing | Overdriving tears film; repeated holes need inspection | Prefer for planned removal and repeated reuse |
| Ring-shank or screw-shank nails | Secure sheet along approved support lines | Pulling can bruise film and split edges | Use where speed matters and removal damage is acceptable |
| Smooth nails | Temporary positioning where approved | Lower withdrawal resistance than enhanced-shank nails | Limit to positioning, not an assumed primary restraint |
| Through-ties with nuts, washers or cones | Hold opposing wall forms against pressure | Unsealed penetrations admit moisture | Use the engineered tie system and matched hardware |
| Bolts and clamps | Connect framing and walers | Local bearing or misplaced holes | Use at designed structural connection points |
Select fastener length and corrosion protection for the framing material and exposure. Do not treat a plywood face fixing as a replacement for the engineered tie capacity.
Where should screws and nails go?
Place screws and nails on the approved support lines, with their centres and edge distances shown on the panel drawing. Keep them away from tie bores, cones, joints and areas where the fastener head would print through the concrete face. The formwork designer sets spacing from support geometry and expected pressure.
Pre-mark stud or bearer positions so installers do not miss the framing. Near edges, use a pilot hole where the fastening system calls for one and avoid forcing an oversized fastener through the veneers. Set screw heads flush to the specified depth without cutting the film; remove nails with tools that protect the panel surface.
How far apart should ties be on an 18 mm wall panel?
An 18 mm sheet thickness does not establish tie spacing. The engineer must calculate the fresh-concrete lateral pressure and the tributary load carried by each tie, then check the entire load path through panel, studs, walers, washers, nuts and bracing. Placement rate, temperature, mix behaviour, wall height and vibration affect the demand.
The US Occupational Safety and Health Administration’s 1996 revision of 29 CFR 1926.703 requires formwork to support anticipated vertical and lateral loads, and requires current formwork drawings at the jobsite. This is a US construction rule, not a plywood thickness-to-spacing chart.
A useful drawing therefore includes tie grid dimensions, design pressure, allowable tie working load, bearing details and the support layout. Do not copy a spacing from another wall merely because both use 18 mm plywood.
How do tie types and accessories change the hole?
Plain threaded ties, coil ties, snap ties and water-stop assemblies use different hardware interfaces. The panel drawing must follow the selected system’s dimensional and working-load information. Nuts and washers transfer load at the outside face; cones or sleeves establish the interface at the plywood opening.
For water-retaining walls, specify the water-stop and tie-recess treatment separately. Bore sealing protects plywood, not the finished concrete wall.
Which factory line and shipment plan apply?
HCPLY presses film-faced formwork panels on our construction line, using an acacia or eucalyptus core with phenolic or melamine film. Our furniture line instead makes full-stitched, sanded furniture panels; our commercial and packing line makes acacia-core MR-glue panels for commercial or packing work.

| Same nominal 18 mm need | Core and finish | Typical specification decision |
|---|---|---|
| Construction line | Acacia or eucalyptus; film-faced, unsanded | Drilled and sealed tie-hole pattern for concrete forms |
| Furniture line | Styrax or eucalyptus; sanded | Cabinet or furniture surface, without formwork hole pattern |
| Commercial and packing line | Acacia; unsanded or light-sanded | Packing or general commercial sheet, without film face |
At 1220 × 2440 × 18 mm, the acacia lookup is 31.08 kg per sheet and 880 sheets per full 40HC; eucalyptus is 34.83 kg and 795 sheets. Those figures exclude film weight. A mixed-specification container must remain within the 28.5 t payload limit; use the container-load reference and mixed-container arrangements to plan the load.
The packing or commercial plywood range addresses a different use from concrete-contact film-faced panels. Keep their purchase specifications separate even when the sheets share a shipment.
What should the inspector check before loading?
The inspector should compare the signed panel drawing against a drilled sample and then sample the production batch. Check panel identity, hole count, centre positions, diameter, film damage, bore sealing and fit with the agreed hardware. Photograph both faces and a close view of the sealed bore with the panel ID visible.

Inspect edge sealing after any custom cutting, and reject visible veneer breakout or coating gaps against the agreed acceptance criteria. Record the drawing revision and inspection result with the order documentation. The packing list identifies the shipped panel quantities and specifications; after loading, the draft shipping documents come to you for approval.
Our three factories handle different builds, and the buyer inspects at the producing factory. HCPLY coordinates specification, on-site quality control, documents and loading for the export shipment.
What specification should the buyer send?
Send a written panel schedule and a dimensioned tie-hole drawing before tooling or batch drilling starts. Include the actual tie hardware reference, a sample approval step and an inspection acceptance rule. For the film-faced build, state whether the glue is melamine (MR) or phenolic (WBP), and specify the film surface separately from the core.

Film weight options are 120 g/m² standard, 135 g/m² premium and 220 g/m² for anti-slip film only. For construction panels, the thickness tolerance is ±0.5 mm and the length and width tolerance is ±2 mm. The chosen drilling tolerance must be defined on the drawing rather than inferred from these panel tolerances.
The minimum order is one 40HC, with mixed specifications permitted within the payload limit. Ask Lucy at HCPLY contact for a quotation against the finished drawing and written build; the drilling pattern, coating requirement and order mix affect the quotation.
Application: Reusable concrete wall formwork; factory-drilled tie holes
Line / core: Construction / acacia or eucalyptus
Glue: Phenolic WBP or melamine MR, as specified
Emission: E0 / E1 / E2 class, as specified
Face and grade: Phenolic or melamine film; film weight and finish specified
Thickness and tolerance: 18 mm, ±0.5 mm
Size: 1220 × 2440 mm; length/width ±2 mm
Hole schedule: Attached approved drawing, revision, diameters and seal acceptance
Quantity: [sheets and mix per 40HC]
Destination port: [port]
Next step: book a factory visit with Lucy at export@vietnam-plywood.com to inspect the drilled and sealed sample.